RELOCATION UOL

In 2019, Newcon provided IT equipment relocating services and installed optical, coaxial and cat 6 structured cabling on the UOL DIVEO website.

The project involved 378 pieces of equipment to be placed in 6 internal cages at the Data Center.

In the relocating service, we carry out a Site Survey of the infrastructure, inventory of equipment, connectivity and racks.

We install all the optical, coaxial and structured cabling necessary for activating the equipment, organizing the racks and certification.